If you have never owned an export or import dirt move as the GC, it can look like a simple trucking buyout. In the field it behaves more like a temporary logistics system: quantities change after the first day of dig, receivers reject undocumented loads, gates jam, and your excavator sits waiting on cycle time. Getting it right the first time is less about clever rates and more about a short checklist you actually finish before iron swings. When your roster cannot cover the move, Jobsite Exchange hosts open Dirt Board listings and Book a Haul introductions so first-time GCs can publish the same checklist facts to a wider net.

Sourcing fill or checking local export? Browse the Dirt Board by map radius for open export and import listings near your jobsite before you lock a long haul. Browse the Dirt Board

This guide is for mixed crews - GCs and PMs who own the outcome, excavators who produce the yards, and independent haulers who turn those yards into tickets. Check items off as you go; your progress stays on this device so you can come back tomorrow.

Before the first load rolls

  • Rough cubic yards estimated (bank and loose called out if you know them)
  • Material type named - clean fill, topsoil, rock, concrete, mixed, or other
  • Testing / acceptance docs identified if the receiver will ask for them
  • Receiving site or disposal path confirmed for export (or source confirmed for import)
  • Gate hours, check-in, PPE, and radio channel written down
  • Load-out or dump pad planned - firm ground, swing clearance, truck turn
  • Truck type agreed (end-dump, transfer, tri-axle, rolloff) and daily load target
  • Who counts loads and where tickets are filed same day
  • Backup haul or material option named if the first plan slips

See the Material Path End to End

Draw the path once on paper or use the flow below. If any box is fuzzy, that is where phone tag and idle iron show up later.

Export path (mirror it for import)

  1. Cut / surplus
  2. Reuse or export?
  3. Haul plan
  4. Receiver accepts
  5. Tickets & close-out

Field note Import is the same chain in reverse: confirmed source → haul plan → dump location on your site → tickets. Never assume a “free dirt” pile is accepted until the receiving site says what they will take.

First Export Week - Step by Step

A practical order of operations

  1. Lock the receiver before you dig deep: Know where material can go and what paperwork they require. A cheap tip that rejects your loads is not cheap.
  2. Stage the pad and the route: Soft mud and blocked gates kill more first-week moves than missing trucks. Walk it with the excavator op.
  3. Match iron to truck cycle: If the excavator can load four trucks an hour, you need that many in rotation - or accept idle time in the bid.
  4. Count every load from day one: Photos of tickets and a simple tally beat arguing about yards after the stockpile is gone.
  5. Re-forecast midweek: Bank yards rarely match loose yards. Update the GC look-ahead so concrete and utilities are not surprised.

First Import Week - Step by Step

When material is coming to you

  1. Write the spec in one sentence: What you will accept, what you will reject, and who on site can turn a truck away.
  2. Pick source by haul distance, not sticker price: Ten extra miles often costs more than a slightly higher per-yard number nearby.
  3. Protect the dump spot: Keep the pad clear of trades, mark overhead lines, and decide where the pile can grow without blocking the next pour.
  4. Sequence deliveries to production: A wall of trucks at 7 a.m. with nowhere to dump is as bad as no trucks at all.

Who Owns What

GC / PM usually owns

  • Receiver or source acceptance
  • Look-ahead dates and urgency
  • Site rules, gate hours, safety brief
  • Backup plan if plan A slips

Excavator / hauler usually owns

  • Load-out production and pad condition
  • Truck type fit and cycle time
  • Scale tickets and load counts in the field
  • Flagging rock, debris, or soft access early

Those lines blur on small jobs - that is fine. What matters is that someone is named for each box on the checklist. “We thought the other guy had it” is how first-time moves go sideways.

For Excavators and Independent Haulers Working With a First-Time GC

Be explicit. Ask for the checklist items even if nobody handed you a form. A five-minute alignment at the gate beats a two-hour delay at lunch. If you are the hauler, confirm truck type, soft ground, and who signs tickets before you deadhead in.

  • Send a short written confirmation: yards target, hours, contact on site
  • Stop the line if material or access does not match what was described
  • Keep payment and insurance conversations direct between the parties doing the work

When You Need a Wider Net

Your usual contacts will cover many first moves. When they cannot - new market, surge volume, or surplus that could help another site - open listings and haul introductions are another way to publish the same checklist facts. Browse nearby have-dirt or need-dirt posts, or post your own with quantity, material, and gate hours. Jobsite Exchange hosts those open listings and can help connect you with independent providers; you still agree price and schedule directly.

Common Mistakes to Avoid

  • Starting the cut with no confirmed receiver or disposal path
  • Skipping material class and docs until a load gets turned away
  • No named person counting loads or filing tickets
  • One truck when production needs three - then blaming “hauling” for idle excavators
  • Assuming free or cheap dirt is acceptable without asking the receiving site

Finish the checklist, walk the pad, and write one clear request. Whether you fill it with your roster or use the Dirt Board and Book a Haul for introductions, the field work stays the same: safe access, honest yards, and tickets you can stand behind.

First move and need a wider net? Post your export or import need with quantity, material type, and access notes - participating crews and brokers browse open listings in your area. Post a listing